Crown Point Community Library
Winfield Branch Library
Interior renovation of the nearly 6,000-sqft library in Winfield, IN. The entire job was completed from start to finish in two months.
  • Project Type
    • Building
  • Status
  • Delivery Method
    • Lump Sum
  • Services
  • Location
    • Winfield, IN
  • Duration
    • 2 Months
  • Size
    • 5,800 sqft
  • Architect
    • Shive-Hattery
Project Overview

Berglund Construction performed a 5,800-sqft renovation of the existing Winfield Branch Library. The entire job was completed from start to finish in two months. The scope of work included completion of interior demolition; new interior metal framing; and all new electrical, plumbing and HVAC.

The new space consists of a large general library area, small café, office, workroom, IT closet, restrooms, storage rooms, staff prep area, kitchenette and large meeting room. It also features small build-out areas for teens, youth and small children. New finishes were installed including lighting, carpet, Vinyl Composite Tile (VC) and Luxury Vinyl Tile (LVT) flooring and new exterior illuminated signage.