KishHealth System Physician Group
Valley West Medical Office Building
Delve into Berglund Constructions and their achievement of building a new two-story, 38,000 sqft medical office facility designed for outpatient services and emergency care.
  • Project Type
    • Building
  • Status
  • Delivery Method
    • Design-Build
  • Services
  • Location
    • Sandwich, IL
  • Duration
    • 10 Months
  • Size
    • 38,000 sqft
  • Architect
    • Cannon Design

Project Overview

Berglund Construction constructed a new 38,000-sqft, two-story medical office building to accommodate outpatient services and emergency care for the parent hospital. The steel and masonry structure with metal stud backup is highlighted by a glass window facade to accentuate the base hospital building and to serve as a “magnet” destination on the hospital campus.

The development of the project required multiple estimates, which led to the establishment of a Guaranteed Maximum Price for the Developer and KishHealth System. The mechanical, electrical and plumbing were scheduled performed on a design-build delivery.