Electrical Joint Apprenticeship and Training Trust
IBEW / NECA Technical Institute Auditorium
Berglund Construction facilitated the renovation for IBEW / NECA Technical Institute Auditorium with meticulous layout, seating, finishes, and equipment added into the auditorium.
  • Project Type
    • Building
  • Status
  • Delivery Method
    • Stipulated Sum
  • Services
  • Location
    • Alsip, IL
  • Duration
    • 2.5 months
  • Size
    • 5,000 sqft
  • Architect
    • Jensen & Halstead

Project Overview

Berglund Construction managed the renovation of the existing auditorium for the IBEW/NECA Technical Institute. The renovation included a brand new layout, seating, finishes, and state-of-the-art audio visual equipment. To garner a larger footprint, we utilized existing storage rooms to increase usable space for the auditorium. Additionally, upgrades were made to include new LEDs and a control system.