BayCare Health System Mease Dunedin Hospital
Emergency Generator Expansion
  • Project Type
    • Building
  • Status
  • Delivery Method
    • GMP
  • Services
  • Location
    • Dunedin, FL
  • Duration
    • 8 Months
  • Size
    • 1,800 sqft
  • Architect
    • Haynes Architects

Expansion of New Emergency Generator Building / Structure. Installation of (2) new 1500 KW Generators, new electrical panels, new controls, and new exhaust systems. Careful interface with existing emergency generators along with tie ins to existing hospital electrical power / system.