BayCare Health System Mease Dunedin Hospital
Emergency Generator Expansion
Berglund Construction enhanced the Emergency Generator Building with two new 1500 KW generators, updated electrical panels, controls, and exhaust systems, efficiently integrating with the hospital’s existing power infrastructure.
  • Project Type
    • Building
  • Status
  • Delivery Method
    • GMP
  • Services
  • Location
    • Dunedin, FL
  • Duration
    • 8 Months
  • Size
    • 1,800 sqft
  • Architect
    • Haynes Architects

Project Overview

Expansion of New Emergency Generator Building / Structure. Installation of (2) new 1500 KW Generators, new electrical panels, new controls, and new exhaust systems. Careful interface with existing emergency generators along with tie ins to existing hospital electrical power / system.