The project consisted of infilling an existing sidewalk vault, installing a waterproofing system, and replacing the surrounding sidewalk slab at 600 West Jackson Boulevard. As part of the work, a new CMU basement wall, comprehensive waterproofing system, and reinforced concrete slab were constructed. These upgrades were designed to improve the structural integrity of the building’s perimeter and protect the basement level from future water infiltration.
1 / 2
2 / 2