Berglund is expanding! And this time, into Wisconsin. This is Berglund’s 7th regional office and 6th in the Midwest. After 15 years of working on restoration projects in the state of Wisconsin, we have been able to establish roots in Milwaukee and better serve our clients.

Berglund found a need in the Wisconsin marketplace for a contractor with our experience and expertise in difficult restoration projects. Our Wisconsin office will provide a range of services to our new and existing clients. Additionally, we want to continue to be the foremost expert in historic restoration in the Midwest, and Wisconsin presents many opportunities to maintain this practice.

Berglund’s primary focus will be exterior façade /envelope repair and projects with additional attention to historic structures. Other areas of focus include masonry restoration, building cleaning, concrete restoration, expansion joint and sealant replacement, plaza deck restoration, waterproofing, injection repairs, structural repairs, and assisting in and performing façade inspections.

Currently, Berglund has 12 awarded projects in Wisconsin.

Kenosha Simmons Island Beach House Phase 2

Scope - Window replacement, plaster restoration, and installation of a new concession area to serve the public during summer months. This building is listed on the National Register of Historic Places.

Milwaukee Honey Creek Bridge

Scope - This historical structure requires approximately 300-tons of existing 8” stone cladding to be removed and disposed of due to no longer being structurally sound. In addition, Berglund will install 200’ new cast-in-place concrete walls.

Milwaukee Area Technical College Building C & T Cleaning

Scope - Berglund will perform exterior repairs to Building C and Building T. Repairs included a multi-step cleaning process to 100% of the exterior Kasota Stone along the street-facing elevations in preparation of the Democratic National Convention. Additional repairs included replacement of custom decorative precast stone elements, exterior repainting, and installation of new sheet metal cladding. Prior to the start of the chemical cleaning process, trial cleaning mockups were performed to determine the best end result utilizing multiple cleaning mockups.

Winnebago County Courthouse Window Replacement

Scope - Berglund was hired to remove all exterior windows on the five-story courthouse and replace them with historic replicas. Work includes the careful removal and abatement of windows and installation of temporary weather protection. The new windows will be installed over the course of four months with extensive coordination efforts to ensure the operations of the courthouse are not disturbed. Repairs to the interior window surrounds will also be completed. In addition, multiple glass block openings will be replaced. This building is listed on the National Register of Historic Places.

Madison City-County Building Façade Repairs

Scope - Berglund was hired to perform hot water cleaning for the entire seven-story municipal building in downtown Madison. In addition to cleaning, multiple stone panels will be re-anchored, concrete repairs will be performed on the precast panels, tuckpointing will be performed on the masonry façade, and sealant joints will be replaced. Work will be performed using a combination of swing stages, rolling scaffolding, and pipe scaffolding.

Kenosha Southport Beach House Phase 2

Scope - Slate roofing replacement, masonry restoration, 100% tuckpointing, and alterations to the buildings main entrance with a new sidewalk. This building is listed on the National Register of Historic Places.

Winnebago County Orrin King Office Building

Scope – Brick and stone rehabilitation.

Oshkosh Convention Center

Scope – Parking deck repairs.

MPS Burdick School

Scope – Chimney repairs.

MPS Pulaski High School Masonry Repairs

Scope – Masonry repairs.

MPS Neeskara Elementary School Masonry Repairs

Scope – Masonry repairs.

Milwaukee Public Library