Berglund Construction performed a 5,800 square foot remodel of the existing strip mall. The entire job was performed from start to finish in 2 months. Scope of work included completion of interior demolition, new interior metal framing, all new electrical, plumbing and HVAC. New library consists of large general library area, small café, 1 office, 1 workroom, book drop, teen area, youth area, children’s area, IT closet, 3 restrooms, 2 storage rooms, staff prep area, kitchenette, and large meeting room. New finishes were installed including lighting, carpet, vct and lvt flooring and new exterior illuminated sign-age.

LOCATION Winfield, IN

DURATION 2 months

SIZE 5,800 Sq. Ft. 

SCOPE Remodel 

ARCHITECT Shive-Hattery