Berglund was hired to provide access to the entire north elevation of the building using six swing stages. Berglund had to utilize elevators on the inside of the building to bring all rigging equipment to the roof. Berglund did miscellaneous grinding, tuckpointing, route and seal of cracks in limestone, limestone patch work and limestone dutchman work. In addition to the masonry work, Berglund contracted with Bennett & Brosseau Roofing to provide and install a rubber liner to two copper roof top gutters. We also worked with Brandenburger Plumbing to scope and inspect four roof top drains for signs of deterioration and to determine if any repairs are needed. Berglund rigged and swung twenty-five swing stage locations on this building, the building has many different levels of flat roofs that Berglund had to access to swing all locations needed. Berglund hired a subcontractor to swing, inspect and perform miscellaneous patching from boatswain chairs, Berglund worked with AlumiTech for this work.

LOCATION Chicago, IL

DURATION 6 months

DELIVERY METHOD Design Build  

SIZE 5,500 Sq. Ft. 

SCOPE Renovation